Wan Sheng Hao Construction - Featured Projects


Featured Projects

Proposed Interim Green At Gardens By the Bay (Marina South)

 

In January 2011, we were awarded as the main contractor to construct the Proposed Interim Green at Gardens by The Bay. This S$9.5 million project will be completed in May 2012.

Pedestrian Bridge Across Sungei Serangoon to Lorong Halus Wetlands

 

In 2009, we were awarded the tender to construct a 170-m pedestrian bridge across Sungei Serangoon to Lorong Halus Wetlands by PUB. A temporary bridge had to be constructed as the building of the bridge took place over the river - Sungei Serangoon. The 170-m pedestrian truss bridge features a steel structure design. This S$3 million project was completed in 2010.

Defu Vehicular Flyover Along Tampines Road (off the Kallang-Paya Lebar Expressway - KPE)

 

In 2009, we completed a 1.8-km vehicular flyover that was an extension of Bartley Road to Airport Road. This flyover, located off Tampines Road, connected to Singapore’s longest expressway, the Kallang-Paya Lebar Expressway (KPE). The most challenging technical aspect about the construction of this flyover was a 60-meter-depth caisson pile undertaken by us. In cooperation with us, the main contractors for the project, Hock Lian Seng Infrastructure Ltd, received a satisfactory commendation from the client, LTA. The value of this project was $5.84 million.